Close Menu
    Trending
    • The Hidden Risk That Crashes Startups — Even the Profitable Ones
    • Systematic Hedging Of An Equity Portfolio With Short-Selling Strategies Based On The VIX | by Domenico D’Errico | Jun, 2025
    • AMD CEO Claims New AI Chips ‘Outperform’ Nvidia’s
    • How AI Agents “Talk” to Each Other
    • Creating Smart Forms with Auto-Complete and Validation using AI | by Seungchul Jeff Ha | Jun, 2025
    • Why Knowing Your Customer Drives Smarter Growth (and Higher Profits)
    • Stop Building AI Platforms | Towards Data Science
    • What If Your Portfolio Could Speak for You? | by Lusha Wang | Jun, 2025
    Finance StarGate
    • Home
    • Artificial Intelligence
    • AI Technology
    • Data Science
    • Machine Learning
    • Finance
    • Passive Income
    Finance StarGate
    Home»Data Science»Power Hungry: Google in Data Center Agreement for Small Modular Nuclear Reactors
    Data Science

    Power Hungry: Google in Data Center Agreement for Small Modular Nuclear Reactors

    FinanceStarGateBy FinanceStarGateFebruary 2, 2025No Comments4 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    IT, like nature, hates a vacuum. Truly, in right now’s world, IT is a digital power of nature. IT’s monumental urge for food for energy is on a trajectory to pressure grids in all places, and in no IT sector is that this extra keenly felt than in HPC-AI, the house of generative AI, the place insatiable energy demand might hobble genAI adoption.

    Mammoth AI information facilities housing acres of HPC-class racks are breaking floor world wide. Clear energy sources in larger portions is an crucial, and the ability vacuum might be addressed by SMRs, small modular nuclear reactors.

    Two firms on the nexus of information facilities and power are Kairos Energy and Google, and so they might level the way in which to methods for addressing the looming HPC-AI energy disaster. Final October, the 2 firms signed a Grasp Plant Growth Settlement making a path to deploy a U.S. fleet of superior nuclear energy tasks totaling 500 MW by 2035.

    Yesterday, Albuquerque-based Kairos mentioned it has efficiently accomplished the set up of the reactor vessel for its second non-nuclear Engineering Check Unit (ETU 2.0). It’s the first reactor vessel to be fabricated in-house at Kairos’ manufacturing improvement campus in Albuquerque.

    The reactor vessel is a part of the engineering check unit, which Kairos mentioned it’s constructing to advance the iterative improvement of its fluoride salt-cooled high-temperature reactor (KP-FHR) expertise.

    Beneath its settlement with Google, Kairos will assemble and function a sequence of superior reactor crops and promote power, ancillary companies, and environmental attributes to Google underneath energy buy agreements (PPAs). Vegetation shall be sited in related service territories to produce clear electrical energy to Google information facilities, with the primary deployment by 2030 to assist Google’s 24/7 carbon-free power and internet zero objectives.

    The settlement with Kairos is a part of Google’s decarbonization technique. Google mentioned since 2010, it has signed greater than 115 agreements totaling over 14 GW of fresh power era capability. The extra era developed the multi-plant settlement with Kairos will complement Google’s use of renewables, corresponding to photo voltaic and wind.

    “This landmark announcement will speed up the transition to wash power as Google and Kairos Energy look so as to add 500 MW of latest 24/7 carbon-free energy to U.S. electrical energy grids,” mentioned Michael Terrell, Google Senior Director of Vitality and Local weather. “This settlement is a key a part of our effort to commercialize and scale the superior power applied sciences we have to attain our internet zero and 24/7 carbon-free power objectives and be sure that extra communities profit from clear and inexpensive energy sooner or later.”

    Kairos characterised the settlement with Google as a developmental and studying relationship that helps expertise improvement by extending Kairos’ iterative demonstration technique by its first business deployments.

    “Constructing on progress from the early iterations, every new plant will allow continued studying and optimization to assist accelerated commercialization,” Kairos mentioned in its announcement.

    “Our partnership with Google will allow Kairos Energy to shortly advance down the educational curve as we drive towards price and schedule certainty for our business product,” mentioned Mike Laufer, Kairos Power CEO and co-founder. “By coming alongside within the improvement part, Google is greater than only a buyer. They’re a accomplice who deeply understands our progressive method and the potential it could actually ship.”

    Kairos mentioned the ETU 2.0 reactor vessel is a building milestone and a contract milestone underneath the corporate’s Know-how Funding Settlement with the U.S. Division of Vitality for threat discount funding by the Superior Reactor Demonstration Program (ARDP).

    Beneath the settlement, Kairos Energy receives mounted, performance-based funds from DOE when it demonstrates the achievement of pre-determined undertaking milestones. DOE has agreed to speculate as much as $303 million in a reactor undertaking, referred to as the Hermes 2 Demonstration Plant in Oak Ridge, TN, by the ARDP, supplementing Kairos Energy’s personal funding.





    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous Article13 Best Investment Opportunities for Accredited Investors
    Next Article GitHub Models 免費試玩 GPT、Llama、DeepSeek | by Tsai Yi Lin | Feb, 2025
    FinanceStarGate

    Related Posts

    Data Science

    FedEx Deploys Hellebrekers Robotic Sorting Arm in Germany

    June 13, 2025
    Data Science

    Translating the Internet in 18 Days: DeepL to Deploy NVIDIA DGX SuperPOD

    June 12, 2025
    Data Science

    Multiverse Computing Raises $215M for LLM Compression

    June 12, 2025
    Add A Comment

    Comments are closed.

    Top Posts

    Why AI Projects Fail | Towards Data Science

    June 7, 2025

    Citigroup Gives Employees Two Weeks of Remote Work in August

    June 11, 2025

    Graph Neural Networks Part 4: Teaching Models to Connect the Dots

    April 30, 2025

    Expert AI and Machine Learning Dissertation Writing and Coding Services for UK Students | by Tutorsindia | May, 2025

    May 8, 2025

    How a Firefighter’s ‘Hidden’ Side Hustle Led to $22M in Revenue

    June 1, 2025
    Categories
    • AI Technology
    • Artificial Intelligence
    • Data Science
    • Finance
    • Machine Learning
    • Passive Income
    Most Popular

    How Edge Computing is Quietly Powering the Future of Retail, Healthcare, and Manufacturing | by Bhavagna Shreya Bandaru | Apr, 2025

    April 22, 2025

    Exploring IMDB Movies Dataset: Key Insights and Marketing Research Implications | by Pourushporwal | Feb, 2025

    February 17, 2025

    Anthony Michael Hall Talks ‘Reacher,’ ‘SNL’ and More

    March 2, 2025
    Our Picks

    Rice Univ. Prof. Lydia Kavraki Elected to National Academy of Engineering for Research in Biomedical Robotics

    February 14, 2025

    Grandma’s Recipe Started Business With $2B+ Annual Revenue

    May 28, 2025

    The Future of Work: Navigating the Evolution of the Job Market Amid AGI Advancement | by Deepan Ilangkamban Ramesh | Jun, 2025

    June 2, 2025
    Categories
    • AI Technology
    • Artificial Intelligence
    • Data Science
    • Finance
    • Machine Learning
    • Passive Income
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    • About us
    • Contact us
    Copyright © 2025 Financestargate.com All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.